Description of Project
The design, construction, commissioning of a new 3ML/d plant.
​
• Raw Water pumping main from Sepopa connects to the head of the new works (1.2ML Elevated Tank) (with provision for dosing of Chlorine Dioxide)
• Two parallel Flocculation Tanks (with provision for dosing of Coagulants)
• Two parallel Clarifiers, of the sludge-blanket type
• Two parallel rapid-gravity sand filters
• A water storage collection tank 104m3 (which serves as a dual-purpose pump-sump for feeding the Granular Activated Carbon (GAC) Filters)
• One Pressurized GAC filter
• 3.6ML treated-water storage reservoir, to meet the storage times/p>
• Chemical dosing equipment needed for preparation and dosing of Lime for pH correction, and primary and secondary coagulants
• A separate building for the preparation of Chlorine Dioxide
• Two parallel filter backwash water recovery tanks
• Overflow pipework that serves the Head of Works, the Clarifiers, the Filters and the Reservoir
• Two sludge Lagoons, and associated feed- and underflow pumping equipment
​
DESCRIPTION OF ACTUAL SERVICES PROVIDED BY OUR STAFF :
​
The services that are being / will be provided by staff is summarized as follows:
Responsible for the hydraulic design; integration of the electrical, control, instrumentation and mechanical design into the treatment works buildings and structures and the design of the building, structural and civil work elements
​
APPROXIMATE VALUE OF SERVICES :
P 3.7 Million
​
TOTAL PROJECT VALUE :
P 34 Million
​
Client: CSC & EC(PTY)LTD