Description of Project

The design, construction, commissioning of a new 3ML/d plant.

​

• Raw Water pumping main from Sepopa connects to the head of the new works (1.2ML Elevated Tank) (with provision for dosing of Chlorine Dioxide)

• Two parallel Flocculation Tanks (with provision for dosing of Coagulants)

• Two parallel Clarifiers, of the sludge-blanket type

• Two parallel rapid-gravity sand filters

• A water storage collection tank 104m3 (which serves as a dual-purpose pump-sump for feeding the Granular Activated Carbon (GAC) Filters)

• One Pressurized GAC filter

• 3.6ML treated-water storage reservoir, to meet the storage times/p>

• Chemical dosing equipment needed for preparation and dosing of Lime for pH correction, and primary and secondary coagulants

• A separate building for the preparation of Chlorine Dioxide

• Two parallel filter backwash water recovery tanks

• Overflow pipework that serves the Head of Works, the Clarifiers, the Filters and the Reservoir

• Two sludge Lagoons, and associated feed- and underflow pumping equipment

​

DESCRIPTION OF ACTUAL SERVICES PROVIDED BY OUR STAFF :

​

The services that are being / will be provided by staff is summarized as follows:

Responsible for the hydraulic design; integration of the electrical, control, instrumentation and mechanical design into the treatment works buildings and structures and the design of the building, structural and civil work elements

​

APPROXIMATE VALUE OF SERVICES :

P 3.7 Million

​

TOTAL PROJECT VALUE :

P 34 Million

​

Client: CSC & EC(PTY)LTD