top of page






Debswana/Woods PLC, [2023 - Ongoing]
Value of Project: P8 Billion
​
Feasibility Stage design to 85% accuracy cost Estimate (included BoQs, 3D models 3 and 3D Similation models). Responsible for the design of the blue area (inside the mine) infrastructure that includes the following scope: Haul rods, water supply, sanitation access roads and parking, bulk earthwork, tailing dams protection and stormwater master planning.
bottom of page