Bergstan Botswana consulting and development engineering company

Value of Project: P119 Million

Feasibility study, Concept, Preliminary and Detailed engineering designs with cost estimates and specifications and Operating manual for the most economic integrated waste management facility (landfill) design option, were undertaken. The investigations conducted include a topographic survey, geotechnical coring and materials investigations and geohydrological studies and survey. Currently undertaking construction supervision support that includes site visits to conduct site inspections, revise and undertake variations or additional work to the contract.