Liberia Raw Water Pipeline Project

introduction

NARRATIVE DESCRIPTION OF PROJECT :

Undertaking all design (ie. civil, structural, mechanical and electrical) work for the project, which involved providing a 5km long 1200mm dia ductile iron gravity pipeline (including valves, chambers & fittings) from a dam to a treatment works, including a 40m long pipe bridge, and access roads, including undertaking a hydraulic and surge analysis.

DESCRIPTION OF ACTUAL SERVICES PROVIDED BY OUR STAFF :

Lead Design Engineer, responsible for the design of the transmission pipeline, which included flow and level control valves, and associated electrical, mechanical and control and instrumentation works. In addition, ensured all design was undertaken in line with the companies ISO 9001 quality assurance procedures.

Date

2020