NARRATIVE DESCRIPTION OF PROJECT :

The Project comprises the design and construction of a new dual carriage major arterial road from Gaborone to the Tlokweng Border Post, either along the existing alignment (40% peri-urban, 60% rural) or as Southern Bypass around the peri-urban area to connect with the Western Bypass of Gaborone.  The project included a new 30km arterial highway (dual and single carriageway) and 15km associated service roads and a new reinforced concrete bridge of some 60m span to dual carriage. Design speed: 100km/hr; Dual Carriageway: 19.6 m wide (5 m median) + 2x 2m footpath; Single Carriageway: 9.6 m wide+ 1 x 2m footpath; Pavement: flexible comprising of asphalt surfacing; graded crushed stone base, upper and lower cement stabilized natural gravel subbase and upper and lower natural gravel selected subgrade

DESCRIPTION OF ACTUAL SERVICES PROVIDED BY OUR STAFF :

Preliminary design, economic appraisal, detail design, tender management and construction supervision including all necessary engineering, geotechnical and hydrological investigations, topographic survey, environmental impact assessment, community liaison, design of geometrics and stormwater drainage, pavement design, structural design, tender documentation and site supervision.

Date

January, 2005

Categories

Transportation

introduction

NARRATIVE DESCRIPTION OF PROJECT :

This is a three-storey office building.  The building consists of a ground floor car park, suspended 1st and 2nd floors.  The reinforced concrete frame supports an SDS floor system.  The roof is of timber trusses with concrete tiles.

Extensive detailed calculations were carried out for the foundations of this building, in order to provide an economical solution to founding on problematic soils.

External civil works comprise paved roads & parking, sewerage, water supply, storm water drainage and boundary wall.

The project is complete and building handed over and occupied by AFA.

DESCRIPTION OF ACTUAL SERVICES PROVIDED BY OUR STAFF :

Full Pre-Contract (Design) and Post-Contract (Supervision) civil and structural engineering services.

APPROXIMATE VALUE OF SERVICES :

P130 000,00

TOTAL PROJECT VALUE :

P5.2 Million

Date

October, 2005

Categories

Urban Development

introduction

NARRATIVE DESCRIPTION OF PROJECT :

The project is to establish a new multidisciplinary classroom and office facility with an area of approximately 28 000m2 for the University of Botswana on the Gaborone campus.

The multi-storey building houses offices, classrooms, laboratories and supporting facilities.  The site is adjacent to the existing Library building and existing hostels on the site are to be demolished to enable construction of the new facility.

The existing sub soil conditions are problematic with an extremely high water table and poor founding material.  Piling is considered the most suitable option on this site.

The structure is a reinforced concrete framed building with maximum slab panel modules of 9m x 7,5m.  The favoured scheme is a conventionally reinforced 215mm deep slab between 1190mm wide by 500mm deep (overall) beams spanning 9 metres.  Lateral stability is provided by shafts and shear walls.

The project is complete and building handed over and occupied by the University of Botswana.

DESCRIPTION OF ACTUAL SERVICES PROVIDED BY OUR STAFF :

Full Pre-Contract (Design) & Post-Contract (Supervision) structural engineering services.

APPROXIMATE VALUE OF SERVICES :

P3 Million (US$500 00.00)

TOTAL PROJECT VALUE :

P256 Million (US$ 40 Million)

Date

July, 2011

Categories

Urban Development

introduction

Assignment Name:

NSC2.3 (92ML Reinforced Concrete Reservoir- Design and Build)

 

This “design and build” project involves a 92ML Reinforced Concrete Reservoir including Access Road, Chambers and pipework.

As the appointed design engineer for the project, design (civil, structural & quality assurance) services were undertaken for work described above, in line with the Owners Engineers specifications, and best international practices.

 

Name Of Client:China Civils (Main Client is Water Utilities Cooperation)

 

Approx. value of the contract

P 200 million (USD 18 million)

 

Date

January, 2003