Loading
Skip to main content

Home/

introduction

NARRATIVE DESCRIPTION OF PROJECT :

The design, construction, commissioning of a new 3ML/d plant.

• Raw Water pumping main from Sepopa connects to the head of the new works (1.2ML Elevated Tank) (with provision for dosing of Chlorine Dioxide)

• Two parallel Flocculation Tanks (with provision for dosing of Coagulants)

• Two parallel Clarifiers, of the sludge-blanket type

• Two parallel rapid-gravity sand filters

• A water storage collection tank 104m3 (which serves as a dual-purpose pump-sump for feeding the Granular Activated Carbon (GAC) Filters)

• One Pressurized GAC filter

• 3.6ML treated-water storage reservoir, to meet the storage times/p>

• Chemical dosing equipment needed for preparation and dosing of Lime for pH correction, and primary and secondary coagulants

• A separate building for the preparation of Chlorine Dioxide

• Two parallel filter backwash water recovery tanks

• Overflow pipework that serves the Head of Works, the Clarifiers, the Filters and the Reservoir

• Two sludge Lagoons, and associated feed- and underflow pumping equipment

DESCRIPTION OF ACTUAL SERVICES PROVIDED BY OUR STAFF :

The services that are being / will be provided by staff is summarized as follows:

Responsible for the hydraulic design; integration of the electrical, control, instrumentation and mechanical design into the treatment works buildings and structures and the design of the building, structural and civil work elements

APPROXIMATE VALUE OF SERVICES :

P 3.7 Million

TOTAL PROJECT VALUE :

P 34 Million

Date

January, 2021

introduction

Assignment Name:

NSC2.3 (92ML Reinforced Concrete Reservoir- Design and Build)

 

This “design and build” project involves a 92ML Reinforced Concrete Reservoir including Access Road, Chambers and pipework.

As the appointed design engineer for the project, design (civil, structural & quality assurance) services were undertaken for work described above, in line with the Owners Engineers specifications, and best international practices.

 

Name Of Client:China Civils (Main Client is Water Utilities Cooperation)

 

Approx. value of the contract

P 200 million (USD 18 million)

 

Date

January, 2003

Categories

Urban Development

Subscribe to Development